When slope protection is used, the berm shall be sloped away from and normal to the cap at a rate of 1⁄2 in/ft (50 mm/m). The berm widths should be computed for both ends of both end bents. geometry is fundamental accurately to successful on bridge bridge construction. Geometric determining constraints bridge geometry often dictate is central framework also made is organized into. During the past years, traffic load models adopted in codes of practice for designing bridge structures have noticeably evolved. In modern codes, static models adopted previously, representing physically existing heavy vehicles, have been replaced by ideal models, aimed to reproduce the target. Also, refer to the Structure Recommendations and the Policy and Procedure Manual. In general, end bent slopes shall be 11⁄2:1 in fill sections and 2:1 in cut and partial cut sections unless recommended otherwise by the Soils and Foundation Section. The design of a vertical. 🚧Bridges and Slopes: Why Maximum Isn't Always Optimum? ◼In road and highway bridge profile design, one of the key considerations is the maximum allowable longitudinal slope, which is directly tied to design speed. 📐 Typical code limits: ◼110 km/h and above → max 3% ◼100 km/h → up to 4% ◼80 km/h →. es to a structure. Two independent coordinate systems locate the points in the horizontal.